PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed storm piping at the Main Lobby going into the 2nd floor Facing East.jpg Set the door frames at the 1st floor Cells Facing West.jpg Sheet rock and metal studs delivery for the Roof.jpg Continued installing duct work at the 2nd floor Facing East.jpg Continued installing sprinkler branches at the 1st floor Facing North.jpg Installed beams throughout Elev. 4 Facing South.jpg Installed sanitary piping at the 1st floor going intot the 2nd floor bathroom 253 Facing South.jpg
Previous pageNext page Sheet rock and metal studs delivery for the Roof
Sheet rock and metal studs delivery for the Roof